Search UC DavisHelp
UC Davis Home Page
UC Davis - Office of the Chancellor - UCD Directives UCD Directives

UC DAVIS: OFFICE OF RESOURCE MANAGEMENT AND PLANNING

October 29, 2001

DEANS, DIRECTORS, DEPARTMENT CHAIRS, and CAMPUS ADMINISTRATIVE OFFICERS

RE: Draft Tiered Initial Study for the UC Davis West Campus Water Tower
Replacement Project

UC Davis proposes to remove existing Domestic Water Tower Number 2 located
west of Highway 113 and to construct a new ground-level water tank to
expand the current domestic water supply and fire flow capacity on campus
lands west of Highway 113.  The existing 100,000-gallon water tower is
located south of Brooks Road on the west campus at UC Davis.  The water
tower is approximately 150 feet tall with an exterior lead-based paint
coating system that is badly corroding.  Replacing the water tower with a
new 300,000-gallon ground tank would be more cost-effective than recoating
the existing water tower and also would improve the domestic water system
on the west campus.  

The tower demolition would be performed by cutting two of the four legs and
pulling the tower over in a southerly direction to an agricultural field.
A lead consultant would be contracted by the University to collect soil
samples before and after demolition of the water tower.  The contractor
would conduct any required lead remediation of soils affected by the tower
demolition.

The new water tank would be located at the UC Davis Airport, on the east
side of Hopkins Road south of Antique Mechanics and adjacent to the former
fire station.  It would be installed at ground level rather than mounted on
a tower.  The new tank would be 24 feet tall and 48 feet in diameter.  A
security fence would enclose the proposed tank and the pumps, controls, and
standby generator that are required to serve the new tank.

I am writing to inform you that a Draft Tiered Initial Study has been
prepared for the proposed construction and operation of the project.  You
are invited to submit written comments on the Draft Tiered Initial Study to
the Office of Resource Management and Planning through November 28, 2001.
Copies of the Draft Tiered Initial Study are available during normal
operating hours at the UC Davis Office of Resource Management and Planning,
376 Mrak Hall on the UC Davis campus; at Reserves in the UC Davis Shields
Library; at the Yolo County Public Library, 315 E. 14th Street, Davis; at
the Vacaville Public Library, 1020 Ulatis Drive, Vacaville; and online at
http://www.ormp.ucdavis.edu/environreview/.

The public notice for this project is available online at
http://www.ormp.ucdavis.edu/environreview/.  The notice includes a brief
project description, statement of objectives, and summary of potential
impacts.  Please contact Laurie Hanson at (530) 752-0259 if you would like
to obtain a printed copy.  

Comments on this Draft Tiered Initial Study must be received by 5:00 p.m.
on November 28, 2001.  They may be e-mailed to environreview@ucdavis.edu or
mailed to:

John A. Meyer
Office of Resource Management and Planning
376 Mrak Hall
University of California
One Shields Avenue
Davis, CA 95616

If you have any questions, please contact UC Davis Environmental Planner
Sid England at (530) 752-2432.

Sincerely,
John A. Meyer
Vice Chancellor - Resource Management and Planning

#01-160



Office of the Chancellor | Contact Information | Current Issues | Speaking Out | Staff and Organization | Philosophy of Purpose | Principles of Community | Administrative Resources

Modified: 12/14/2006 12:22:54 PM
Comments: