UC DAVIS: OFFICE OF RESOURCE MANAGEMENT AND PLANNING

August 31, 2001

DEANS, DIRECTORS, DEPARTMENT CHAIRS, and CAMPUS ADMINISTRATIVE OFFICERS

RE: Draft Environmental Impact Report for UC Davis California Regional
Primate Research Center (CRPRC) Improvement Projects

UC Davis proposes the construction and operation of five improvement
projects at the CRPRC to provide increased infrastructure and facilities
for expanded research.  The campus has prepared a Draft Focused Tiered
Environmental Impact Report (EIR) analyzing the potential significant
environmental effects of the projects.

The projects include: (1) the construction of stormwater drainage
improvements including a stormwater detention basin to eliminate flooding
at and adjacent to the CRPRC; (2) seven new outdoor field corrals and a
stormwater retention basin to retain the runoff from the field corrals; (3)
24 new animal pens or "corncribs" for social housing of monkeys; (4) a new
2,700-assignable-square-foot (asf) building and a 1,600 asf trailer to
provide office space for the Brain, Mind, and Behavior (BM&B) Research
Program; and (5) a modular rodent holding facility of 2,700 asf for the
Center of Comparative Medicine (CCM). 

Each of the five improvement projects is proposed to address certain
program needs or to correct existing problems.  The stormwater drainage
improvements are required to address the problem of flooding in and around
the CRPRC.  The stormwater detention basin would be designed to also
provide wildlife habitat.  The field corrals and corncribs are required so
that the CRPRC can handle the increasing demand for research animals.  The
new BM&B research office building and trailer are needed to replace space
currently located in old temporary buildings that are required for other
purposes.  The rodent facility is needed to provide rodent holding space
near the CCM where rodents are used for research. 

I am writing to inform you that a Draft Focused Tiered Environmental Impact
Report (EIR) has been prepared for the proposed construction and operation
of the projects.  You are invited to submit written comments on the Draft
EIR to the Office of Resource Management and Planning through October 15,
2001.  In addition, a public hearing to receive testimony as part of the
formal record on the Draft EIR will be held on September 26, 2001, at 7
p.m. in the AGR Room of the UC Davis Buehler Alumni and Visitors Center on
Old Davis Road.

Copies of the draft EIR are available during normal operating hours at the
UC Davis Office of Resource Management and Planning, 376 Mrak Hall on the
UC Davis campus; at the Yolo County Public Library, 315 E. 14th Street,
Davis; and at the Vacaville Public Library, 1020 Ulatis Drive, Vacaville.
The document and public notice for this project are available on-line at
http://www.ormp.ucdavis.edu/environreview/.  You will find a brief project
description, statement of project objectives, and a brief summary of
project impacts.  If you are unable to access this website and want to
obtain a copy of the public notice, please contact Laurie Hanson at
(530)752-9259.

If you have any questions, please contact UC Davis Environmental Planner
Sid England at (530)752-2432.

Sincerely,

John A. Meyer
Vice Chancellor - Resource Management and Planning

01-118